The pumped-storage station commissioned in 1984 in caverns inside Elidir mountain beside Llanberis in Snowdonia, north Wales, known locally as Electric Mountain and run by First Hydro Company, a division of Engie. It stores about 9.1 gigawatt-hours and is prized for speed: a single generator reaches full load from standstill in about 75 seconds, and the whole station can reach 1,800 megawatts from spinning reserve in about 16. As pumped storage it consumes more energy pumping than it returns, selling response and peak power rather than generation.
Facts
Facility Type LocationLlanberis, Gwynedd, Wales 1 Capacity (MW)Dispatch capacity; as pumped storage the station is a net consumer of electricity. Commissioned Year Cross-Tradition Connections
Associated With
Uses Source
Sources
1. Wikipedia
Wikimedia FoundationDinorwig Power Station, openingQuote, Dinorwig Power Station, opening
known locally as Electric Mountain, or Mynydd Gwefru
View the Source 1. Wikipedia
Wikimedia FoundationDinorwig Power Station, specification infoboxQuote, Dinorwig Power Station, specification infobox
Commission date: 1984
View the Source 1. Wikipedia
Wikimedia FoundationUses Source: Hydropower, Dinorwig Power Station, specificationQuote, Uses Source: Hydropower, Dinorwig Power Station, specification
From standstill, a single 450-tonne generator can synchronise and achieve full load in approximately 75 seconds
View the Source 1. Wikipedia
Wikimedia FoundationAssociated With: Pumped Storage Hydropower, Dinorwig Power Station, specificationQuote, Associated With: Pumped Storage Hydropower, Dinorwig Power Station, specification
zero to 1800 MW load can be achieved in approximately 16 seconds
View the Source Reader Challenges (0 open reader challenges)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.
View At A Past Year
The atlas records no dated fact of its own for this entry, so there is no other year to choose.